Depending on the size and the type of the installation we regularly travel to an end-user, to put an installation
into operation, local or abroad.
At the request of the customer we can test all functions of the installation, instruct the operators and
technicians, and be present during the first production. We can therefore immediately add new functions if the
customer wishes.
After instruction the customer starts the installation.
For this installation is chosen for a relays controlled control system with many push
buttons which can switch every function separately. The advantage of this panel is
that in case of a malfunction it doesn’t require a high technical level to solve the
problem. The user can easily solve the problem himself.